CEC provided project development, project management, and construction management services to a client building a 27 MW run of river hydroelectric facility. The project consisted of intake works, 6.4 km of penstock, powerhouse housing two 14 MVA synchronous generators along with supporting infrastructure, 13.8/138 kV transformer, and 21 km of 138 kV transmission line. The project was built within the originally allotted 22 months from ground-breaking to delivering power to the BC Hydro grid. In addition, CEC was responsible for procurement, control system engineering, transmission line design, and facility commissioning.
Categories: Run of River and Small Hydro, Project Development, Consulting Engineering, Project Services